Bathroom remodeling — real RBE project
Service · 03 · Bathrooms

Bathroom remodeling

Bathroom remodeling, custom baths, tub-to-shower conversions, and bath expansions. Waterproofed, ventilated, and built to last.

4–6 weeks typical build
Permit-ready drawings
From $25k
Bathrooms · 4–6 weeks
Licensed · Insured · Permit-pulled
MHIC #116809VA #2705166984DC #410516000457
What's included under this service

Everything we run under Bathroom remodeling.

One contract covers everything below. Mix and match — your written proposal itemizes exactly what's in your project.

Custom bathrooms

Full design-build custom bathrooms with bespoke vanities, tile work, and integrated storage.

Bathroom design & build

Drawings, finish selection, and construction under one team — one contract.

Bathroom renovations

Existing-footprint renovations with new fixtures, tile, lighting, and ventilation.

Bathroom expansions

Knock down a wall, steal closet space, or convert a half-bath to a full — structural and plumbing.

Tub-to-shower conversions

Replace an unused tub with a walk-in or barrier-free shower — waterproofed, niched, and tiled.

What RBE handles

Demolition through final walkthrough.

Everything in scope — and the trades that connect to it — runs through one team and one written proposal.

Waterproofing under the tile

Schluter or hot-mop systems on every wet wall. Mud-set pans where the spec calls for it. Leak-tested before tile sets.

Ventilation that actually moves air

Bath fans ducted to the exterior, sized to room volume, on a timer or humidistat. Never vented to the attic.

Storage in every linear foot

Recessed niches, drawer vanities, medicine cabinets between studs. Storage planned for what actually lives in the room.

Heated floors and code-compliant electrical

Mat or hydronic systems, GFCI/AFCI protected, properly sized circuits, permitted and inspected.

Scope of work

What’s in the contract.

Every bathrooms project signed with us includes the items below by default. Project-specific scope additions are itemized in the written proposal.

  • Full tear-out and disposal
  • Plumbing rough-in (drains, supply, vent stack)
  • Electrical rough-in and lighting plan
  • Subfloor repair and substrate prep
  • Waterproofing membrane install + leak test
  • Tile, vanity, fixture, and trim install
  • Final inspection and punch list
How we run it

Five steps. Same on every job.

The process is the proof. No work happens outside the approved scope without a written change order — and the final invoice doesn’t go out until you’ve signed off on the walkthrough.

01

Quick call

15-min intake. Tell us what you want to change.

02

In-person estimate

We walk the space. Measure. Take notes.

03

Proposal in writing

Scope, allowances, timeline — signed before demo.

04

Permits + build

We pull the permit. Coordinate trades. Run the job.

05

Walkthrough

Joint walkthrough. Punch list. Final invoice.

FAQ

Bathrooms questions, answered.

How long does a bathroom remodel take?

Standard bathrooms run 4–6 weeks. A full-tile master with heated floors and a custom shower can push to 7–8 weeks.

Can you convert my tub to a walk-in shower?

Yes — one of our most common bathroom scopes. We re-plumb the drain, build a proper shower pan, waterproof, tile, and install glass.

Can you expand my bathroom?

Yes, when adjacent walls or closet space allows. We handle the structural piece, the plumbing relocation, and the finish work.

Do you handle small mold remediation?

Yes, when it's surface mold from a leak — included as part of the bath scope. Whole-home or HVAC mold gets referred to a licensed remediator.

Ready when you are

Stop getting ghosted by contractors.
Start the project.

Free in-person estimate. Written proposal within a week. Permit-pulled before any demo. We answer the phone.